How Long Lawn Replacement Takes
From the day you ask for a price to the day you mow the new lawn, stage by stage.
The short answer
A written quote arrives within 24 to 48 hours. The work takes 1 to 2 days. Then the new lawn needs 14 days of daily watering before it is walked on or mown.
From request to first mow
Four stages. Only the first has a promised time. The rest are how long the work and the grass take.
- 24–48 h
to a written quote
You send the form. One insured local crew looks at your details and photos and sends a price in writing.
- 1–2
days of work
Day 1: the old lawn is torn out and hauled away and the ground is rough graded. Day 2: topsoil, final levelling, the new lawn and its first watering.
- 14
days of watering
You water every day and keep off the lawn while the roots take. Nothing else is asked of you.
- Day 15
the first mow
Once the lawn passes the tug test, mow it with the mower on its highest setting. The yard is yours again.
Before the job: the written quote
The clock starts when you send the form. It asks which lawn, roughly how big, and whether there is grass there now. Photos help, and so does the width of the gate if the lawn is at the back.
One insured local crew looks at what you sent, measures the yard and sends a price in writing within 24 to 48 hours. The start date is agreed with the crew once you accept the quote. This site does not promise one, because it depends on the season and on the weather.
The job: 1 to 2 days
A replacement that takes both days is done in this order. A small, open lawn can be finished in one.
Day 1
-
The old lawn is torn out
Cut out at the root, across the whole area being replaced.
-
The debris is hauled away
Turf, weeds and thatch leave the property the same day.
-
The ground is rough graded
Humps are cut down and low spots filled, ready for soil.
Day 2
-
Fresh topsoil is delivered and spread
Over the graded ground, so the new roots have soil to grow into.
-
The surface is levelled
A final pass, so the lawn sits even and water does not pool.
-
The new lawn is laid
Kentucky bluegrass, cut fresh from Ontario sod farms and laid the day it arrives.
-
It gets its first watering
Done by the crew before they leave. The daily watering after that is yours.
You do not have to be home
Nobody needs to take a day off work. The crew can do the whole job on their own, as long as they can get to the yard: gates unlocked, pets indoors and vehicles moved out of the driveway.
The preparation guide lists what to do beforehand.
The 14 days after
The crew's part is finished. This part is the grass taking root.
Water the new lawn every day for the first 14 days, morning and evening when the weather is hot. After that the watering tapers. The written guidelines the crew leaves set out the detail, and the guarantee depends on following them.
Keep off the lawn for those 14 days, except to move a sprinkler. That includes children, pets and garden furniture.
Roots take 10 to 14 days to hold. To check, take a corner of the turf and tug it gently. If it lifts, give it more time. If it holds, the lawn is ready for its first mow, with the mower on its highest setting.
What can lengthen it
None of these changes the order of work. They change when it starts or how long a stage takes.
-
Weather
Heavy rain can turn bare ground to mud, and grading waits until it drains. Lawns are not laid on frozen ground.
-
Access
A narrow gate or a long carry from the driveway means more of the work is done by hand.
-
The time of year
Spring and early autumn are when most homeowners ask, so start dates tend to be further out then.
-
The size and state of the yard
A large lawn, or one that needs heavy grading, is more likely to use both days.
Read next
Timing questions
All questionsHow many days does the work itself take?
1 to 2 days. On day 1 the old lawn is torn out and hauled away and the ground is rough graded. On day 2 fresh topsoil is delivered and spread, the ground is levelled, the new lawn is laid and it gets its first watering. A new lawn on bare ground typically takes 1 day.
When can children and pets go back on the lawn?
After 14 days, once the lawn passes the tug test. Until then it has to be left alone, apart from moving sprinklers.
How long before a new lawn can be mown?
14 days. The roots take 10 to 14 days to grip the soil. Once a corner lifted gently holds firm, mow with the mower on its highest setting.
Start with a written price
- Free, and in writing
- One insured, WSIB-covered crew
- A price within 24 to 48 hours